Jeffery Sehl

Munn Gene contracting has completed the sub-floor framing and installed the structural posts on the Jeffery/Sehl project. The column caps are in place, ready for the roof beams to be erected.

Blackwell Engineers have design a series of column caps to facilitate the roof beams and provide a structural moment connection. The connector will provide lateral support for the structure along elevations that are entirely glass.  

Great action on the shore in Tobermory.