Duggan Trimble

Scot-build Developments has initiated the ICF and pier construction on the Duggan Trimble project, the concrete will be poured the second week of November.

The ICF foundation system is specified 4' - 6" below grade, and will feature additional living space below the upper level kitchen, living and dining rooms. The bedroom wing is to the left and will be constructed onto steel piers at the upper level floor elevation.