Castor

Mill House Construction has completed the interior Radiata Pine wall and D. Fir ceiling application.

Petrini Construction has almost completed the Vic West corrugated steel application, the bronze color is specified to the Inline window frame.

The south elevation living room and bedrooms cantilever 4 feet beyond the walk out lower level, the living room bay is a full 8 foot cant.

castor b3.jpg