Painters Point

Mill House Construction has initiated the foundation for the Painter's Point project, our standard encapsulated crawl space is bearing down on bedrock.

Lower level sub-floor is completed and posts erected.

Second level floor beams were erected with the help of a crane in a day.

The 2nd level lake elevation will feature a cantilevered deck off the master bedroom on all 3 elevations.