Chapman Kanee

Kenworth Homes is installing the exterior siding on the Chapman/Kanee project, a combination of corrugated steel and prefinished wood was specified for the 2 level structure.

Vic-West fabricated trims include Inside/Outside corners, Partitions and all J-Channels, these are standard components for all steel siding profiles.

The upper level is clad with a Maibec Lamosite random width T&G wood siding, a vertical application was specified to contrast the horizontal corrugated steel profile on the lower level.

Tomlinson Mechanical has installed the hydronic radiant floor heating pex system, at the Chapman/Kanee project, the 2″ Gyp-crete floor underlayment will be poured shortly.