Hebel Foell

This aerial Phantom 4 shot shows the two volumes integration with the building sites sloped topography. North Steel is erecting the 12' X 48' cantilevered steel deck from the common living space and screened in porch located between the two floor systems.

Connecting a steel beam from the exterior deck framing to the second level cantilevered engineered wood floor system.

Connecting a steel beam from the exterior deck framing to the second level cantilevered engineered wood floor system.

Hopkins Crane swung this 700 pound, 32 foot beam into place after erecting the steel columns from grade piers to the sub-floor elevation.

Hopkins Crane swung this 700 pound, 32 foot beam into place after erecting the steel columns from grade piers to the sub-floor elevation.

The steel columns, beams and diagonal braces were assembled on site and erected onto the concrete pier anchor bolts with leveling plates.

The steel columns, beams and diagonal braces were assembled on site and erected onto the concrete pier anchor bolts with leveling plates.

This image shows the lower level ICF foundation and cantilevered sub-floor, with mechanical crawl space below. Second level ICF frost wall with infill and concrete slab and third level ICF retaining wall along the rear elevation.

This image shows the lower level ICF foundation and cantilevered sub-floor, with mechanical crawl space below. Second level ICF frost wall with infill and concrete slab and third level ICF retaining wall along the rear elevation.

TJS Construction has initiated the lower level sub-floor framing and Dewayen Simms Construction is preparing to pour the second level concrete slab.

TJS Construction has initiated the lower level sub-floor framing and Dewayen Simms Construction is preparing to pour the second level concrete slab.

Nailer plate and top mount joist hangers are connected to the steel beam.

Nailer plate and top mount joist hangers are connected to the steel beam.

The ICF frost wall infill is insulated with 2" rigid and grid re-bar is installed to reinforce the concrete slab.

The ICF frost wall infill is insulated with 2" rigid and grid re-bar is installed to reinforce the concrete slab.

Based on the the sloped topographic ridge beyond the lower level foundation, an 8 foot steel cantilevered sub-floor was specified to provide the bedroom square foot requirements and exterior catwalk.

Based on the the sloped topographic ridge beyond the lower level foundation, an 8 foot steel cantilevered sub-floor was specified to provide the bedroom square foot requirements and exterior catwalk.