Preachers Point

The lake elevation features floor to ceiling patio doors, a four foot roof cant on both elevations will block the high angle summer sun from penetrating the interior space.

The second level living room floats beyond the lower level bedroom volume, three steel columns structurally facilitate the floor and roof loads.

The second level living room floats beyond the lower level bedroom volume, three steel columns structurally facilitate the floor and roof loads.

A foot bridge will provide access from the elevated rock face to the second level main entrance. A set of exterior stairs will descend from the far end of the catwalk to a path leading to the lake.

A foot bridge will provide access from the elevated rock face to the second level main entrance. A set of exterior stairs will descend from the far end of the catwalk to a path leading to the lake.

Roof framing and sloped purlin's have been constructed, ply substrate is being applied.

Roof framing and sloped purlin's have been constructed, ply substrate is being applied.

Second level Parallam posts have been erected, the roof beams and connectors are on deck ready to be installed.

Second level Parallam posts have been erected, the roof beams and connectors are on deck ready to be installed.

The second floor framing has been completed and the interior floor sheathing glued and screwed. The open joist area beyond has been designed one foot lower to facilitate a roof deck from the kitchen and dining room. Sleepers and decking will be constructed onto the lower roof membrane,  bringing the deck elevation up to the interior finished floor height.

The second floor framing has been completed and the interior floor sheathing glued and screwed. The open joist area beyond has been designed one foot lower to facilitate a roof deck from the kitchen and dining room. Sleepers and decking will be constructed onto the lower roof membrane,  bringing the deck elevation up to the interior finished floor height.

A combination of Parallam PSL and Microllam LVL were specified by Blackwell Engineering for the post and beam superstructure.

A combination of Parallam PSL and Microllam LVL were specified by Blackwell Engineering for the post and beam superstructure.

Jeff Howe Construction has initiated the structural framing, three visually light steel columns support the second level living room.

Jeff Howe Construction has initiated the structural framing, three visually light steel columns support the second level living room.