Hebel Foell

Tom Prentice Construction excavated the sloped bedrock building footprint with a 22 ton hoe. Two connected structures will be elevated onto steel piers above the lower lake front grade, while hugging the site along the rear elevation.

A mini excavator navigates the ridge along the lake elevation.